Quick Cost Comparison
| Method | Unit Cost Range $/ft² |
Total Cost |
|---|---|---|
| Traditional | $ | $ |
| TerraForm | $ | $ |
| Material Savings (avg) | $ | |
| Labour Difference (per day) | $200 | |
Base Inputs & Assumptions
| Description | Value | Units |
|---|
1. Construction Cost Breakdown
| Material | Labor | Total | |
|---|---|---|---|
| Traditional | |||
| TerraForm | |||
| Savings | |||
2. CO₂ Emissions
| Total kg CO₂ | |
|---|---|
| Traditional | |
| TerraForm | |
| Saved |
3. Timeline
| Days | Months | |
|---|---|---|
| Traditional | ||
| TerraForm | ||
| Faster by |
4. Waste & Dumpster
| % Waste | ft² Waste | Dumpster $ | |
|---|---|---|---|
| Traditional | 7% | ||
| TerraForm | 2% | ||
| Saved |
5. Financing Interest
| Interest $ | |
|---|---|
| Traditional | |
| TerraForm | |
| Saved |
6. Annual Energy Savings
| Low $/yr | High $/yr |
|---|---|
7. Lifecycle Maintenance (30 yrs)
| Total $ | |
|---|---|
| Traditional | |
| TerraForm | |
| Saved |
Cumulative Value Summary
| Metric | RENCO | Traditional | Net Savings |
|---|---|---|---|
| CapEx | |||
| CO₂ (kg) | |||
| Dumpster / Waste | |||
| Loan Interest | |||
| Energy (30 yrs) | — | ||
| Maintenance (30 yrs) |