Total Value & Impact Calculator
Pick a Project Type, enter basic info, then compare Traditional with TerraForm in full technical detail.
Residential
Commercial
Quick Cost Comparison
Method | Unit Cost Range $/ft² |
Total Cost |
---|---|---|
Traditional | $ | $ |
TerraForm | $ | $ |
Material Savings (avg) | $ | |
Labour Difference (per day) | $200 |
Base Inputs & Assumptions
Variable | Description | Value | Units |
---|
1. Construction Cost Breakdown
Material | Labor | Total | |
---|---|---|---|
Traditional | |||
TerraForm | |||
Savings |
2. CO₂ Emissions
Total kg CO₂ | |
---|---|
Traditional | |
TerraForm | |
Saved |
3. Timeline
Days | Months | |
---|---|---|
Traditional | ||
TerraForm | ||
Faster by |
4. Waste & Dumpster
% Waste | ft² Waste | Dumpster Cost | |
---|---|---|---|
Traditional | 7% | ||
TerraForm | 2% | ||
Saved |
5. Financing Interest
Interest | |
---|---|
Traditional | |
TerraForm | |
Saved |
6. Annual Energy Savings
Low $/yr | High $/yr |
---|---|
7. Lifecycle Maintenance (30 yrs)
Total | |
---|---|
Traditional | |
TerraForm | |
Saved |
Cumulative Value Summary
Metric | RENCO | Traditional | Net Savings |
---|---|---|---|
CapEx | |||
CO₂ (kg) | |||
Dumpster / Waste | |||
Loan Interest | |||
Energy (30 yrs) | — | ||
Maintenance (30 yrs) |